Holland Board of Public Works

For this project, we created three new outdoor, unheated storage buildings for the Holland Board of Public Works, each supporting a different dedicated storage need for the HBPW. These pre-engineered metal buildings were erected atop new poured-concrete knee walls. One building’s concrete walls measured eight feet above the pavement elevation and houses all of the HBPW’s sand, gravel and stone aggregate. These buildings are enclosed by 24’ wide powered overhead doors that are paired with lighting control switches