Along with providing the residents with a beautiful new home and the comfort to age in place, the development offers many amenities for all to enjoy, highlighted by underground parking, state-of-the-art dining facilities (indoor and outdoor), wellness programs, walking paths, and so much more. Overall, the site consists of over 20 acres, all of which will be developed over the life of the community in subsequent phases.
Site-Development
The Farmstead development required modification of over 20 acres of land previously used for farming. Extensive storm water management was needed to protect adjacent natural areas and park lands. The campus required all new utility infrastructure and the relocation of a high voltage power distribution line.
Fun Facts
- Over 5,500 sheets of drywall were hung.
- Over 136,000 feet of lineal trim was installed, which is 25.7 miles!
- Over 1,200 doors, including 138 pocket doors, were hung.
- Over 850 bundles of cedar shims were used.
- At peak, we had 163 tradespeople onsite at one time, which included 32 EV self-perform employees.
- Our EV self-perform tradespeople spent over 50,000 hours onsite.
- 88 of our tradespeople touched this job.
- All the independent living units had 20 unique finish options, creating 104 custom apartments or homes.
- Our interior team installed over 13,500-SF of acoustical ceiling tile, which equates to 3 NBA basketball courts, over 3,000 king-size beds, or half of a football field.
The People
-
Brett Lesiewicz
Vice President of Project Management -
Ryan Guerink
Field Manager -
Brian Piper
Field Manager -
E.J. Calloway
Senior Field Manager -
Parker Slagh
Field Manager -
Nick Novakoski
Project Manager -
Hannah Thurlow
Assistant Project Manager