City of Grand Rapids | Lab
EV built a temporary laboratory in an existing building to be used while the new permanent lab building was being renovated. With this project, our team demoed the existing lab and renovating space to create an updated laboratory space with open floor plan. Curved drywall ceilings were installed with matching flooring curves to add character to the space and a new viewing window was added for visitors to look into the lab space.