GMB Architecture + Engineering

EV managed this two-phase renovation of GMB’s Holland office. Phase 1 included separating the floor into multiple tenant units with a common corridor. Phase 2 was the fit-out of GMB’s new space. This space includes unique ceiling features, open collaborative workspaces, and breakout rooms for the architecture and engineering firm.

Renovation

Project Type

85 E 8th Street Suite 200, Holland, MI

Project Location
GMB Architecture Engineering Holland Michigan Renovation EV Construction
GMB Architecture Engineering Holland Michigan Renovation EV Construction
GMB Architecture Engineering Holland Michigan Renovation EV Construction
GMB Architecture Engineering Holland Michigan Renovation EV Construction
GMB Architecture Engineering Holland Michigan Renovation EV Construction
GMB Architecture Engineering Holland Michigan Renovation EV Construction