Fun Facts
- This project took over 135,000 labor hours to construct, which equates to an average of 45 tradespeople per day onsite from start to finish of construction.
- Over 40,000 cubic yards of sandfill, or just over 3,000 full sized dump truck loads, were brought in to bring the site to grade before construction of the building could start.
- The facility has 444 total doors. These openings contain 105 total maglocks and over 25,000 total tamper-resistant fasteners.
- 92,215 feet of electrical conduit – which is over 17 miles.
- 425,766 feet of wire pulled – that’s over 80 miles of wire!
The People
-
Dan Behler
Director of Healthcare & Senior Living at EV Construction -
Jared Andersen
Senior Project Manager -
Dan Jenema
Senior Field Manager -
Julie Cole-Bouwens
Assistant Project Manager -
Garret Veenstra
Assistant Field Manager